EQUIPMENT STAGING
Proper staging and logistics solutions are the key building blocks for flexible and successful hardware delivery and installation services. Configuration preparations can speed up initial delivery times and minimize deployment costs. Equipment testing and burn-in is an effective way of curbing the initial end-user frustration and expense of out-of-box and early operation failures.
Neeco technical staff can work with the client’s staff to create a detailed testing procedure for each outbound order and ensure that quality assurance measures and inspections are fully documented for each unit. Additionally, Neeco can perform a burn-in test for one or more days, depending on client requirements.
The staging itself consists of two main parts: physical completion of the kit, and software and configuration upload. Physical completion of hardware is useful especially when the kit chassis requires interface cards and modules to be installed and checked together. Software and configuration can be installed and checked for compatibility before the device arrives on-site, potentially saving hours of time during equipment installation.
Equipment and Technologies Services
Get in touch with us
Feel free to use the form or contact us
directly via email or phone.
*Mandatory Fields